欧美超碰在线 I 草草影院国产第一页 I 91色综合 I 国产欧美精品aaaaaa片 I 视频在线成人 I 国产精品手机在线 I 国产麻豆精品sm调教视频网站 I 黑人巨大精品欧美一区二区小视频 I 可以免费看的av毛片 I 久久精品国产自清天天线 I 欧美性一区二区三区 I 亚洲最大成人网4388xx I 国产高潮流白浆喷水视频 I 91女同 I 久久精品免费播放 I 黄色网址在线免费观看 I 成人mv高潮版视频大尺度 I 欧美人与物ⅴideos另类 I 亚洲 自拍 欧美 小说 综合 I 久久噜噜色综合一区二区 I 欧美日韩高清在线 I 产精品无码久久_亚洲国产精 I 久久亚洲精品综合国产仙踪林 I 2021亚洲va在线va天堂va国产 I 亚洲欧美一区二区三区 I 色婷婷一区二区 I 一区一区三区产品乱码 I 亚洲日韩成人 I 亚洲国产精品久久亚洲精品大牛 I 热久色 I 91淫黄看大片 I 日本人性爱视频 I 一区二区三区在线观看视频 I 五月激情五月激情 I 日本一二三四高清不卡

Shenzhen great tower Industrial Co., Ltd.

Advantages and daily use of filters

Views: Update time:2020-11-06

Ensure that the pneumatic diaphragm pump is always in good operation or standby state. Domestic pneumatic diaphragm pump, fire pump, spray pump, booster pump, sewage pump and air conditioner pneumatic diaphragm pump are installed in all buildings. The maintenance personnel of the management department are responsible for the regular maintenance of the pneumatic diaphragm pump.


1、 Daily inspection and maintenance shall be carried out once a week for domestic pneumatic diaphragm pump and air conditioner pneumatic diaphragm pump, and comprehensive maintenance shall be conducted once every six months.

2、 The fire pneumatic diaphragm pump and spray pump shall be put into trial operation once a month, and the booster pump shall be operated every two months for 10-15 minutes. When the fire pump is started, the test fire hydrant outlet water spray range at the top of the pipe network shall be more than 6m, and the comprehensive maintenance shall be conducted once every half a year.

3. Check packing sealing condition, if there is water leakage, add or replace asbestos rope packing.

4. If the coupling bolts and rubber pads are damaged, they should be replaced.

5. Tighten the frame screw and do rust proof treatment.

6. Due to the frequent operation of domestic pneumatic diaphragm pump and air conditioner pneumatic diaphragm pump, the bearings at both ends of the coupling should be removed every year for cleaning or replacement.

6、 Motor maintenance

1. The appearance inspection shall be neat, the name plate shall be in good condition, and the grounding wire shall be well connected.

2. Remove the wire connecting piece in the motor junction box, and use a 500V megohmmeter to test the insulation resistance of the motor winding between phase to phase and phase to ground, which should not be less than 0.5 megohm.

3. The three-phase conductor and connecting piece in the motor junction box shall be firm and tight.

7、 Maintenance of related valves, pipes and accessories

1. The opening and closing of each valve shall be flexible and reliable without leakage inside and outside.

2. The action of one-way valve shall be flexible and there shall be no water leakage inside and outside the valve body.

3. The indication of pressure gauge is accurate and the dial is clear.

4. The appearance of pipes and accessories shall be neat and beautiful without cracks, and the paint shall be complete without falling off.

5. Inching to judge whether the pneumatic diaphragm pump steering is correct, if there is any error, it should be corrected.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號